MnDOT Seeks Input on Carlton Highway Corridor Plans

Avatar photo

ByDeborah Cole

November 24, 2026

Carlton residents can review MnDOT’s Highway 45 and Highway 210 corridor study at a Dec. 3 open house, as the agency prepares for resurfacing projects planned for 2035.

Carlton residents and other users of Highway 45 and Highway 210 will have a chance to comment on the routes’ future when the Minnesota Department of Transportation holds a public open house Dec. 3 on a corridor study.

The meeting is scheduled for 5:30 to 7 p.m. at the Carlton Fire and Ambulance Building, 100 Fourth Street, Carlton. A brief presentation is planned for 5:45 p.m. MnDOT staff and project consultants will be available throughout the event. The public can review study information, ask questions and provide feedback.

The study covers Highway 45 from Interstate 35 south to Carlton, and Highway 210 from east of County Road 61 to Sixth Street North in Carlton. MnDOT is conducting the work in partnership with local project partners and stakeholders. The corridors are being studied in preparation for resurfacing projects planned for 2035.

That work is still at the study stage. MnDOT’s announcement does not identify a preferred design, commit to particular road changes or provide a construction schedule beyond the planned resurfacing year. Instead, the agency says it is evaluating opportunities to improve safety, access and mobility. Feedback gathered during the study is intended to help inform future recommendations.

The issues named for consideration span several kinds of travel and public access. They include vehicle speeds, pedestrian crossings, trails, freight movement and interchange design. The announcement does not say which locations have prompted particular concerns, whether the study has already identified specific problems, or what solutions might be considered. It also provides no traffic counts, cost estimates or funding plan.

The Highway 45 study area’s connection to Interstate 35 and the Highway 210 segment through Carlton give the review a regional as well as local scope. But MnDOT’s notice does not describe proposed changes to the I-35 interchange or indicate that any interchange redesign has been selected. Interchange design is listed as one of several issues under consideration, alongside freight movement and the ways people travel on foot or by trail.

For residents, businesses and other people who use the routes, the open house offers an early opportunity to share how the corridors function. Attendees can examine the study information and raise questions directly with MnDOT staff and consultants. The topics the agency has identified include speeds, pedestrian crossings, trail connections, freight travel, access and interchange design. MnDOT says comments gathered through the study will help shape recommendations, though its announcement does not specify a comment deadline or explain how to submit feedback after the event.

The distance between this review and construction is substantial: resurfacing is planned for 2035. MnDOT’s announcement does not give a date for completing the study or outline the sequence of decisions between the current evaluation and the eventual projects. The Dec. 3 gathering is therefore an opportunity to learn about the study and provide input, not a presentation of a final project plan.

The open house is set for Thursday, Dec. 3, at the Carlton Fire and Ambulance Building. People needing an ASL or foreign-language interpreter, another reasonable accommodation, or documents in an alternative format such as braille or large print can contact Janet Miller at adarequest.dot@state.mn.us or 651-366-4720, MnDOT said. Further information is available on the Highway 45 and Highway 210 Corridor Study website.

The source material available for this report verifies this Carlton transportation announcement, dated Nov. 23. It does not substantiate other developments from the last two days in Moose Lake, Kettle River, Cloquet or the Duluth metro area, so no additional local stories are included.

Leave a Reply

Your email address will not be published. Required fields are marked *